This page provides access to public notices concerning TMDL plans developed
by ADEQ.
In accordance with Section 303 (d) of the Federal Water Pollution Control Act
each State is required to identify all waters which do not meet the water quality
standards and to calculate a total maximum daily load (TMDL) for each pollutant
which exceeds the State's Water quality standards. The calculated load must
then be allocated among all contributors of the pollutant in an amount which will
not exceed the TMDL. A plan for meeting the TMDL and coming into compliance with
the water quality standards must also be developed.
Notices are posted in order of the notice date, with the most recent notices
appearing at the top of the list.