General Stormwater NPDES Permits

When stormwater from rain or snow melt flows, it carries dirt, litter, chemicals, or other pollutants that could harm water quality. Stormwater discharges are considered point sources, and stormwater permitting is administered under the National Pollutant Discharge Elimination System (NPDES) program.

DEQ issues individual and general stormwater permits. The permit conditions for an individual permit are specific for each facility. General permits are used for those facilities with similar operations. Facilities seek coverage with a Notice of Intent (NOI) document to obtain coverage under a general permit.

Find notices of a specific general permit:

How to Receive Coverage through a General Stormwater Permit

DEQ considers issuing a Notice of Coverage (NOC) to facilities seeking coverage only after payment has been received. When applicable, send a completed and signed NOI, a completed Stormwater Pollution Prevention Plan (SWPPP), and permit fee to:

Division of Environmental Quality
Water Discharge Permits Section
5301 Northshore Drive
North Little Rock, AR 72118-5317

Or email documents in PDF format to Water Permits Application.

Most General NPDES Permits may be completed and submitted online through the DEQ ePortal site.

  • Visit the DEQ ePortal website.
  • Select Organization. A drop-down menu will appear.
  • Scroll to Water, General NPDES Permits to find form selections.
  • Before using ePortal, register online then download and complete the DEQ Electronic Signature Agreement form and mail it to the Electronic Signature Agreement Committee, Division of Environmental Quality, 5301 Northshore Drive, North Little Rock, AR 72118.

Why use ePortal?

The DEQ ePortal system has all the conveniences of online submission while also allowing you to track your submission’s progress.

  • DMR - Discharge Monitoring Report
  • NOC - Notice of Coverage
  • NOI - Notice of Intent
  • NOT - Notice of Termination
  • SWPPP - Stormwater Pollution Prevention Plan
  • SWAR - Stormwater Annual Report

General Stormwater Permits

The following general stormwater permits are available in Arkansas and are listed with coverage forms and information. Select the appropriate category below.

Construction Stormwater Permits

Permit: ARR150000 Large Site (5 Acres or More)

Expires: October 31, 2026

Annual Fee: $200

General Permit Information Application Documents As Needed Documents

Permit ARR150000

Response to Comments

Fact Sheet

Construction Stormwater forms must be submitted through the SEEK system.

The below forms are available at: seek.ee.arkansas.gov

  • Water - Construction Stormwater General Permit (ARR150000) - Notice of Intent
  • (When Applicable) Water - Construction Stormwater General Permit (ARR150000) – Recertification
  • Water - Construction Stormwater General Permit (ARR150000) - Notice of Termination
Construction Stormwater Permit Fees
  • Application Fees must be submitted before the application is received. Online payment is preferred and is available within the SEEK system after signing the application.
  • Annual Fees will be billed within the SEEK system. Online payment is preferred and is available on your SEEK User Dashboard.

Permit: ARR150000 Small Site (AUTOMATIC COVERAGE for 1 Acre or More but Less than 5 Acres)

Expires: October 31, 2026

General Permit Information Required Documents

Permit ARR150000

Response to Comments

Fact Sheet

Post the following at the site prior to beginning construction.
Do NOT send any documents to DEQ.

  • Notice of Coverage (NOC):
  • Stormwater Pollution
    Prevention Plan
    (SWPPP):
  • Inspection Form:

Industrial Stormwater Permits

Subscribe to receive notifications of upcoming permitting activities and requirements such as permit renewals, comment periods, recertification requirements, and other important news regarding the Stormwater Industrial General Permit ARR000000.

Permit: ARR000000

Expires: June 30, 2024

Annual Fee: $200

General Permit Information Application Documents As Needed Documents

Permit ARR000000
(effective July 1, 2019)

Fact Sheet

Industrial Sectors Covered

Comments Received

Response to Comments

Effective July 1, 2024:

Permit ARR000000

Fact Sheet

Response to Comments

Stormwater Annual Report (SWAR) Form

Industrial Stormwater forms must be submitted through the SEEK system.

The below forms are available at: seek.ee.arkansas.gov

  • Water - Industrial Stormwater General Permit (ARR000000) - Notice of Intent
  • Water - Industrial Stormwater General Permit (ARR000000) - Modification
  • Stormwater Pollution
    Prevention Plan
    (SWPPP):
  • Stormwater Annual Report (SWAR):
  • SWAR Appendix:

    NOTE: This form can be used only as an attachment to the SWAR Form - not as a sole reporting form.

  • Notice of Permit Transfer Form:
Industrial Stormwater Permit Fees
  • Application Fees must be submitted before the application is received. Online payment is preferred and is available within the SEEK system after signing the application.
  • Annual Fees will be billed within the SEEK system. Online payment is preferred and is available on your SEEK User Dashboard.

Municipal Separate Storm Sewer System (MS4)

Find notices of facilities that have submitted a recent Notice of Intent (NOI) for coverage or renewal

Permit: ARR040000

Expires: July 31, 2024

Annual Fee: $200

General Permit Information Required Documents As Needed Documents

Permit ARR040000

Fact Sheet

Response to Comments

Effective August 1, 2024:

Permit ARR040000

Fact Sheet

  • Notice of Intent (NOI):
  • Stormwater Management Program (SWMP)
    • Refer to Part 3 of the Current Permit for SWMP requirements

Submit the following each year of permit term: