Regulated Storage Tanks (RST) Data Files
Storage Tank Details for This Facility
Facility ID | AFIN | Location Name/Address | Temp Out | AG | UG | Leak | 1998 Compl |
---|---|---|---|---|---|---|---|
60001998 | 60-01218 |
CENTER POINT TERMINAL CO LLC 3206 GRIBBLE STREET NORTH LITTLE ROCK, AR 72114 County: PULASKI |
X |
Contact Name: | HAROLD MITCHELL | Date Received: | 06/14/2017 |
Contact Title: | FACILITY MGR | Entry Date: | 08/31/2000 |
Contact Phone: | (501) 945-7497 | Entry Clerk: | BATEMAN |
Location SIC: | Update Date: | 06/15/2017 | |
Location AFIN: | 60-01218 | Update Clerk: | fields |
Latitude: | 34.749687 | Amended: | Y |
Longitude: | -92.231407 | Certified Name: | BERNIE SHEIL |
Aboveground: | X | Title: | COMPLIANCE MGR |
Underground: | Date Signed: | 6/9/2017 | |
Date Reg. Cert. Issued: | 7/17/2023 | Do not invoice, if marked: | [] |
OwnerID | Owner Name/Address | Phone |
---|---|---|
008984 | CENTER POINT TERMINAL COMPANY 3206 GRIBBLE STREET NORTH LITTLE ROCK, AR 72114 |
(501) 945-7497 |
County: | PULASKI | Last Date Updated: | 06/15/2017 |
Owner Type: | 1 | Entry Clerk: | BATEMAN |
Date Form Received: | 08/28/2000 | Update Clerk: | fields |
Date Form Entered: | 08/31/2000 |
Date Signed | Financial Assurance Mechanism | Entry Clerk | Entry Date | Update Clerk | Update Date |
---|---|---|---|---|---|
08/15/2013 | FAOF - Financial Assurance on file | MCNAIR | 08/16/2013 | ||
07/05/2017 | FAOF - Financial Assurance on file | taylord | 07/05/2017 |
Invoice # | Date Billed | Owner as of Billing Date | Status | Amount/ Date Due |
Last Amount Paid/ Last Date Paid |
Last Check # | Late Fee Billed | Total Paid |
---|---|---|---|---|---|---|---|---|
ABT018609 | 09/05/2000 | CENTER POINT TERMINALS INC. | $50.00 10/20/2000 |
$50.00 09/05/2000 |
7094 | $50.00 | ||
ABT019053 | 04/12/2001 | CENTER POINT TERMINALS INC. | Void | 05/27/2001 |
||||
ABT020727 | 05/18/2001 | CENTER POINT TERMINALS INC. | $50.00 07/01/2001 |
$50.00 07/01/2001 |
9398 | $50.00 | ||
ABT022646 | 05/17/2002 | CENTER POINT TERMINALS INC. | $50.00 06/30/2002 |
$50.00 07/01/2002 |
011890 | $50.00 | ||
ABT024448 | 05/09/2003 | CENTER POINT TERMINALS INC. | $50.00 06/30/2003 |
$50.00 06/10/2003 |
14138 | $50.00 | ||
ABT026185 | 05/14/2004 | CENTER POINT TERMINALS INC. | $50.00 06/30/2004 |
$50.00 06/22/2004 |
17094 | $50.00 | ||
TKS073835 | 05/16/2005 | CENTER POINT TERMINALS INC. | $50.00 06/30/2005 |
$50.00 06/21/2005 |
20443 | $50.00 | ||
TKS078970 | 05/19/2006 | CENTER POINT TERMINAL COMPANY | $75.00 07/03/2006 |
$75.00 06/20/2006 |
24690 | $75.00 | ||
TKS084158 | 05/08/2007 | CENTER POINT TERMINAL COMPANY | $75.00 06/30/2007 |
$75.00 06/19/2007 |
029610 | $75.00 | ||
TKS089346 | 05/15/2008 | CENTER POINT TERMINAL COMPANY | $75.00 06/30/2008 |
$75.00 06/16/2008 |
034278 | $75.00 | ||
TKS094457 | 05/11/2009 | CENTER POINT TERMINAL COMPANY | $75.00 06/30/2009 |
$75.00 06/23/2009 |
039100 | $75.00 | ||
TKS099607 | 05/17/2010 | CENTER POINT TERMINAL COMPANY | $75.00 06/30/2010 |
$75.00 06/01/2010 |
043653 | $75.00 | ||
TKS104802 | 05/17/2011 | CENTER POINT TERMINAL COMPANY | $75.00 06/30/2011 |
$75.00 06/24/2011 |
048717 | $75.00 | ||
TKS110335 | 05/14/2012 | CENTER POINT TERMINAL COMPANY | $75.00 06/30/2012 |
$75.00 06/15/2012 |
53705 | $75.00 | ||
TKS115578 | 05/15/2013 | CENTER POINT TERMINAL COMPANY | $75.00 06/30/2013 |
$80.00 09/04/2013 |
060326 | $5.00 | $80.00 | |
TKS119599 | 08/16/2013 | FUTURE FUEL CHEMICAL COMPANY | $75.00 08/16/2013 |
$75.00 08/16/2013 |
143842 | $75.00 | ||
TKS121702 | 05/14/2014 | FUTURE FUEL CHEMICAL COMPANY | $75.00 06/30/2014 |
$75.00 06/27/2014 |
150360 | $75.00 | ||
TKS126788 | 05/06/2015 | FUTURE FUEL CHEMICAL COMPANY | Void | 06/30/2015 |
||||
TKS140036 | 06/15/2017 | CENTER POINT TERMINAL COMPANY | $150.00 07/15/2017 |
$150.00 07/18/2017 |
088833 | $150.00 | ||
TKS141217 | 05/15/2018 | CENTER POINT TERMINAL COMPANY | $150.00 06/30/2018 |
$150.00 06/12/2018 |
096077 | $150.00 | ||
TKS146137 | 05/14/2019 | CENTER POINT TERMINAL COMPANY | $150.00 06/30/2019 |
$150.00 06/12/2019 |
103977 | $150.00 | ||
TKS151100 | 05/13/2020 | CENTER POINT TERMINAL COMPANY | $150.00 06/30/2020 |
$10.00 08/10/2020 |
277 | $10.00 | $160.00 | |
TKS155925 | 05/10/2021 | CENTER POINT TERMINAL COMPANY | $150.00 06/30/2021 |
$150.00 06/15/2021 |
118730 | $150.00 | ||
TKS160783 | 05/10/2022 | CENTER POINT TERMINAL COMPANY | $150.00 06/30/2022 |
$150.00 06/02/2022 |
125467 | $150.00 | ||
TKS165769 | 05/10/2023 | CENTER POINT TERMINAL COMPANY | $150.00 06/30/2023 |
$150.00 05/24/2023 |
131539 | $150.00 |
No Underground Storage Tank Information was found in our database for this facility.
Latitude: | Entry Date: | 08/31/2000 | |
Longitude: | Entry Clerk: | MCNAIR | |
Capacity: | 11000 | Update Date: | 08/16/2013 |
Update Clerk: | MCNAIR |
Status | Substance | Tank Material | |||
---|---|---|---|---|---|
Install Date: | 05/01/1993 | Empty: | X | Steel: | X |
Tank Status: | Permanently Out Of Use | Diesel: | Concrete: | ||
Tank Status Date: | 08/16/2013 | Kerosene: | Plastic: | ||
Date Last Used: | 07/01/2000 | Gasoline: | Unknown: | ||
Removed: | Used Oil: | Other Description: | |||
Gals Remaining: | 0 | Hazardous: | |||
Unknown: | |||||
Mixture Description: | |||||
Other Description: |
Internal Corrosion Protection | External Corrosion Protection | Piping | |||
---|---|---|---|---|---|
Cathodic Prot. System: | Cathodic Prot. System: | Bare Steel: | |||
Lining: | Painted: | X | Galvanized Steel: | X | |
None: | X | Plastic: | Plastic: | ||
Unknown: | None: | Cathodic: | |||
Other Description: | Unknown: | Unknown: | |||
Other Description: | Other Description: |
Latitude: | Entry Date: | 08/16/2013 | |
Longitude: | Entry Clerk: | strickland | |
Capacity: | 20000 | Update Date: | 06/23/2015 |
Update Clerk: | strickland |
Status | Substance | Tank Material | |||
---|---|---|---|---|---|
Install Date: | 08/08/2013 | Empty: | X | Steel: | X |
Tank Status: | Permanently Out Of Use | Diesel: | X | Concrete: | |
Tank Status Date: | 03/01/2015 | Kerosene: | Plastic: | ||
Date Last Used: | 03/01/2015 | Gasoline: | Unknown: | ||
Removed: | N | Used Oil: | Other Description: | ||
Gals Remaining: | 0 | Hazardous: | |||
Unknown: | |||||
Mixture Description: | |||||
Other Description: |
Internal Corrosion Protection | External Corrosion Protection | Piping | |||
---|---|---|---|---|---|
Cathodic Prot. System: | Cathodic Prot. System: | Bare Steel: | X | ||
Lining: | Painted: | Galvanized Steel: | |||
None: | Plastic: | Plastic: | |||
Unknown: | None: | Cathodic: | |||
Other Description: | DBL WALL | Unknown: | Unknown: | ||
Other Description: | DBL WALL | Other Description: |
Latitude: | Entry Date: | 06/15/2017 | |
Longitude: | Entry Clerk: | ||
Capacity: | 30000 | Update Date: | |
Update Clerk: |
Status | Substance | Tank Material | |||
---|---|---|---|---|---|
Install Date: | 06/01/2016 | Empty: | Steel: | X | |
Tank Status: | In Use | Diesel: | Concrete: | ||
Tank Status Date: | Kerosene: | Plastic: | |||
Date Last Used: | Gasoline: | Unknown: | |||
Removed: | Used Oil: | Other Description: | |||
Gals Remaining: | Hazardous: | ||||
Unknown: | |||||
Mixture Description: | |||||
Other Description: | ETHANOL |
Internal Corrosion Protection | External Corrosion Protection | Piping | |||
---|---|---|---|---|---|
Cathodic Prot. System: | Cathodic Prot. System: | Bare Steel: | |||
Lining: | X | Painted: | X | Galvanized Steel: | |
None: | Plastic: | Plastic: | |||
Unknown: | None: | Cathodic: | |||
Other Description: | Unknown: | Unknown: | |||
Other Description: | Other Description: | EPOXY PAINT |
Latitude: | Entry Date: | 06/15/2017 | |
Longitude: | Entry Clerk: | ||
Capacity: | 30000 | Update Date: | |
Update Clerk: |
Status | Substance | Tank Material | |||
---|---|---|---|---|---|
Install Date: | 06/01/2016 | Empty: | Steel: | X | |
Tank Status: | In Use | Diesel: | Concrete: | ||
Tank Status Date: | Kerosene: | Plastic: | |||
Date Last Used: | Gasoline: | Unknown: | |||
Removed: | Used Oil: | Other Description: | |||
Gals Remaining: | Hazardous: | ||||
Unknown: | |||||
Mixture Description: | |||||
Other Description: | ETHANOL |
Internal Corrosion Protection | External Corrosion Protection | Piping | |||
---|---|---|---|---|---|
Cathodic Prot. System: | Cathodic Prot. System: | Bare Steel: | |||
Lining: | X | Painted: | X | Galvanized Steel: | |
None: | Plastic: | Plastic: | |||
Unknown: | None: | Cathodic: | |||
Other Description: | Unknown: | Unknown: | |||
Other Description: | Other Description: | EPOXY PAINT |
No Storage Tank Leak information was found in our database for this facility.