List of Draft and General Permit Notices of Intent (NOIs)

Draft Air Permit Decisions that have been issued by DEQ within the previous seventy-five (75) days are listed below. Draft permit Decisions are open for public comment for at least thirty days from the date the notice is published. Please contact the Air Permits Branch for the specific comment period on any draft permit of interest.

In addition, facilities that have submitted Notices of Intent (NOIs) for coverage under an Air General Permit are also listed. NOIs are not subject to public comment but are listed here as a public service.

List of Draft Permits
7/31/2025 - 10/14/2025

*Note: Click underlined AFIN links for detailed information on Air Permitting applications for the Facility;
Click underlined Permit No links to view a PDF copy of the Draft Permit/Statement of Basis.

 AFIN*  Facility  Draft Permit/
Statement of Basis*
 Approximate
Draft Date
 Submission ID
Recs Found: 23
<<   <    /3  >   >> 
   
30-00008 Acme Brick Company - Perla Plant

Description: Acme Brick Company - Perla Plant - Renewal

1154-AOP-R9

1154-AOP-R9-SOB
09/10/2025 HQ5-GRWN-RW2FV
45-00251 Advanced Marine Performance, LLC

Description: Advanced Marine Performance, LLC - to add small reinforced composite manufacturing process using closed molding process

2388-AOP-R2

2388-AOP-R2-SOB
09/29/2025 HQC-HGF7-6TT4S
43-00024 Ammunition Operations LLC - Lonoke

Description: Ammunition Operations, LLC (Lonoke) - install a new kiln and alter setup

1272-AOP-R1

1272-AOP-R1-SOB
08/08/2025 HQ7-2AJT-5XG3M
50-00006 Amrize Building Envelope LLC

Description: Amrize Building Envelope LLC - removal of Carbon Black Storage Tanks (SN-01A, 01B, 101A, 101B, and 201) and adding new carbon black sources

0698-AR-34

0698-AR-34-SOB
09/15/2025 HQE-P44D-PTSRP
30-00337 Arkansas Electric Cooperative Corporation - Magnet Cove Generating Station

Description: Arkansas Electric Cooperative Corporation - Magnet Cove Generating Station - revise monitoring methodology for 2 duct burners (SN-01 & 02)

1987-AOP-R9

1987-AOP-R9-SOB
08/29/2025 HQD-M36H-3GPNJ
02-00028 Bakelite Chemicals LLC

Description: Bakelite Chemicals LLC - add Clayton Steam Generator Boiler (SN-154) and Melamine Hopper to the IA table as an A-13 source

1177-AOP-R23

1177-AOP-R23-SOB
09/11/2025 HQC-5ZVJ-5Z7FT
70-00098 Clean Harbors El Dorado, LLC

Description: Clean Harbors El Dorado, LLC - add SN-24J, South Side Fire Pump Engine (175 HP), remove SN-24A, Fire Pump Generator Lister (44.25 HP) and SN-24B, Fire Pump CAT 3208 (196HP)

1009-AOP-R29

1009-AOP-R29-SOB
08/14/2025 HQD-9P00-XN1CQ
04-00100 Glad Manufacturing Company

Description: Glad Manufacturing Company - proposed new emission limits associated with the resin extrusion towers, and transportation equipment

0407-AOP-R15

0407-AOP-R15-SOB
10/08/2025 HQF-4TA7-ZM8TD
04-00313 Hendren Plastics, Inc.

Description: Hendren Plastics, Inc - Title V Renewal

1290-AOP-R3

1290-AOP-R3-SOB
09/17/2025 HQB-73CV-5F5D5
69-00298 Lignetics of AR and MO, LLC

Description: Lignetics of AR and MO, LLC - install a new baghouse to control emissions from the Hammermill (SN-03) and Pellet Cooler with Cooler Screen 1 (SN-04) and add pre-existing sources to the permit.

2227-AR-3

2227-AR-3-SOB
08/29/2025 HQB-V049-4J2JH

General Permit NOIs