Notices of Intent (NOI) for Asbestos Abatement

APC&EC Regulation 21 requires that, for any demolition (21.601 & 21.602) of a structure or part of a structure (even if no asbestos is present), the owner or operator submit a written Notice of Intent (NOI) to DEQ. An NOI is also required for various types of renovations; refer to Regulation 21 (21.603, 21.605, 21.2223) for details. Additionally, a new NOI is required for a change in operator (21.610). NOIs for both demolition and renovation activities should be submitted at least 10 working days before any activity begins. Original NOIs should be hand delivered or postmarked by the U.S. Postal Service, UPS, FedEx, or other commercial delivery service.

Facilities scheduled for demolition or renovation can be found by using the NOI data search form below.

Asbestos Abatement NOI Submittals Data Search

Enter your search information; then click the Search button. Scroll below search fields to view results. For a complete list, leave all fields blank.

Facility Information
A down arrow

 Download a zipped copy of the full Access database
(AsbNOI_web.zip - Approximate file size 1,008.27 KB)
NOTE: Data current as of 04/25/2024