List of Draft and General Permit Notices of Intent (NOIs)
Draft Air Permit Decisions that have been issued by DEQ within the previous seventy-five (75) days are listed below. Draft permit Decisions are open for public comment for at least thirty days from the date the notice is published. Please contact the Air Permits Branch for the specific comment period on any draft permit of interest.
In addition, facilities that have submitted Notices of Intent (NOIs) for coverage under an Air General Permit are also listed. NOIs are not subject to public comment but are listed here as a public service.
AFIN* | Facility |
Draft Permit/ Statement of Basis* |
Approximate Draft Date |
Submission ID | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
60-00689 |
Arkansas Children's Hospital Description: Arkansas Children's Hospital - Add SN-24 (2,500 kW (Non-Emergency Generator), add IA items in A-3, A-5, and A-13 |
1923-AOP-R11 1923-AOP-R11-SOB |
06/12/2025 | HQA-7H4V-H62EW | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
41-00001 |
Ash Grove Cement Company Description: Ash Grove Cement Company - revise the emissions limits for SN-40F.TX1 in the emission summary to reflect potential emissions from the 6.5 MMBtu/hr TOU and specific conditions WDF-1 and WDF-2 |
0075-AOP-R26 0075-AOP-R26-SOB |
05/27/2025 | HQA-HSS7-RK5BT | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10-00531 |
Building Materials Manufacturing LLC Description: Building Materials Manufacturing LLC |
2482-AR-1 2482-AR-1-SOB |
05/20/2025 | HQB-RDPR-CN8J6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66-00219 |
Covia ISP, Inc. - Fort Smith Plant Description: Covia ISP, Inc. - Title V Renewal |
0492-AOP-R15 0492-AOP-R15-SOB |
05/07/2025 | HQ8-YTZC-G351Z | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16-00222 |
Crane Composites, Inc. Description: Crane Composites, Inc. - add dual-fuel combustion capability to their emergency generator (SN-09) |
2111-AOP-R7 2111-AOP-R7-SOB |
05/05/2025 | HQ8-7ZBW-X7YDY | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60-06113 |
Creative Foam Products, LLC. Description: Creative Foam Products, LLC - Install a relatively small new block mold former under SN-01 |
2448-AOP-R1 2448-AOP-R1-SOB |
05/19/2025 | HQB-02FX-47EJP | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
60-00049 |
CT GS Building Products, Inc. Description: CT GS Building Products, Inc. - to add a recycling system |
1145-AR-13 1145-AR-13-SOB |
06/09/2025 | HQ4-VMF5-FBS9K | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26-01829 |
FiberPro LLC Description: FiberPro LLC - New |
2496-A 2496-A-SOB |
06/10/2025 | HQ5-FV44-N6YY3 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66-00274 |
Gerdau MacSteel Inc. Description: Gerdau MacSteel Inc. - replace the two existing electric arc furnaces with one new electric arc furnace |
0693-AOP-R15 0693-AOP-R15-SOB |
05/29/2025 | HQ7-J2CW-4AW7T | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
66-00212 |
GNB Fort Smith LLC Description: GNB Fort Smith LLC - to install a lead melting pot as part of an automated post casting operation |
0288-AR-18 0288-AR-18-SOB |
05/28/2025 | HQ6-22CQ-VZGE8 |