List of Draft and General Permit Notices of Intent (NOIs)

Draft Air Permit Decisions that have been issued by DEQ within the previous seventy-five (75) days are listed below. Draft permit Decisions are open for public comment for at least thirty days from the date the notice is published. Please contact the Air Permits Branch for the specific comment period on any draft permit of interest.

In addition, facilities that have submitted Notices of Intent (NOIs) for coverage under an Air General Permit are also listed. NOIs are not subject to public comment but are listed here as a public service.

List of Draft Permits
12/14/2025 - 2/27/2026

*Note: Click underlined AFIN links for detailed information on Air Permitting applications for the Facility;
Click underlined Permit No links to view a PDF copy of the Draft Permit/Statement of Basis.

 AFIN*  Facility  Draft Permit/
Statement of Basis*
 Approximate
Draft Date
 Submission ID
Recs Found: 18
<<   <    /2  >   >> 
   
07-00035 Aerojet Rocketdyne, Inc.

Description: Aerojet Rocketdyne, Inc. - to install a Liner Vertical Machine in Building 106 as SN-172.

0617-AOP-R24

0617-AOP-R24-SOB
02/10/2026 HQG-C3SB-5Z7B1
29-00304 Arkansas Electric Cooperative Corporation - Fulton CT1 Generating Station

Description: Arkansas Electric Cooperative Corporation - Fulton CT1 Generating Station - Renewal

1860-AOP-R8

1860-AOP-R8-SOB
01/05/2026 HQ9-WMCR-NNCM4
47-00448 Associated Electric Cooperative, Inc. - Dell Power Plant

Description: Associated Electric Cooperative, Inc. - Dell Power Plant - removal of the restriction to operate SN-01 and SN-02 (Turbines) on only No. 2 Fuel Oil

1903-AOP-R16

1903-AOP-R16-SOB
02/27/2026 HQG-82HF-8QW66
03-00081 BassCat Boats - Yar-Craft Boats

Description: BassCat Boats d/b/a Yar-Craft Boats - Renewal

1624-AOP-R7

1624-AOP-R7-SOB
01/07/2026 HQC-KW1C-382QV
60-00049 CT GS Building Products, Inc.

Description: CT GS Building Products, Inc. - to add a dust collector for SN-131 to be known as SN-922

1145-AR-14

1145-AR-14-SOB
02/04/2026 HQF-6F8F-P1CXA
30-00081 Enable Gas Transmission, LLC - Malvern Compressor Station

Description: Enable Gas Transmission, LLC - Malvern Compressor - Title V Renewal

1102-AOP-R8

1102-AOP-R8-SOB
02/27/2026 HQF-ME0K-WHATE
47-01073 Exploratory Ventures, LLC

Description: Exploratory Ventures, LLC - to increase the capacity of the permitted DRI process from 2.0 million tons per year of DRI products to 2.5 million tons per year of DRI

2445-AOP-R5

2445-AOP-R5-SOB
02/06/2026 HQG-GWPW-TDJPF
02-00013 Georgia-Pacific Crossett LLC

Description: Georgia-Pacific Crossett LLC - Renewal

0597-AOP-R27

0597-AOP-R27-SOB
01/21/2026 HPZ-NT51-C8E5H
07-00212 Georgia-Pacific Wood Products LLC - Fordyce, Arkansas OSB Plant

Description: Georgia-Pacific Wood Products LLC - Fordyce, Arkansas OSB Plant - replace the existing natural gas-fired burners with two new 30 MMBtu/hr natural gas-fired burners.

1803-AOP-R28

1803-AOP-R28-SOB
01/16/2026 HQG-VWNQ-AQ3MA
29-00125 Hexion Inc. - Hope Plant

Description: Hexion Inc. - adding an emergency engine (SN-13).

1590-AR-25

1590-AR-25-SOB
01/16/2026 HQH-5ZEF-C172T

General Permit NOIs